-
SWMS for Electricians, ASP Contractors, Communication Cablers and General Trades
-
Bundle SWMS packs at discounted prices
-
Compliant with WHS legislation and the Safe Work Australia Codes of Practice
-
ASP SWMS Available
-
Generic SWMS titles
Call us Now!
Owen Leslie - WHS Manager
P: +61 2 9744 1099
M: 0488 665 653
Free 15 Minute Phone Consult with No Obligation
SWMS |
TITLE |
Price |
NECA
Members
Price
|
BUY NOW |
---|
1 |
Accessing & set up of a work site
(free for members only- please log in)
|
$75.00
$55.00
|
$55.00
Free
|
|
2 |
Safe use of ladders |
|
|
|
3 |
Erecting, altering & dismantling scaffold |
$75.00
$55.00
|
$55.00
$45.00
|
|
4 |
Safe use of elevated work platform |
$75.00
$55.00
|
$55.00
$45.00
|
|
5 |
Excavations |
$75.00
$55.00
|
$55.00
$45.00
|
|
6 |
Restraint and fall arrest systems |
$75.00
$55.00
|
$55.00
$45.00
|
|
7 |
Confined space work |
$75.00
$55.00
|
$55.00
$45.00
|
|
8 |
Restricted space work |
$75.00
$55.00
|
$55.00
$45.00
|
|
9 |
Working with asbestos |
$75.00
$55.00
|
$55.00
$45.00
|
|
10 |
Hazardous areas |
$75.00
$55.00
|
$55.00
$45.00
|
|
11 |
Work around high pressure gas lines |
$75.00
$55.00
|
$55.00
$45.00
|
|
12 |
Gas welding, cutting and similar processes |
$75.00
$55.00
|
$55.00
$45.00
|
|
13 |
Low voltage isolation
(free for members only- please log in)
|
$75.00
$55.00
|
$55.00
Free
|
|
14 |
Energise and commission
(free for members only- please log in)
|
$75.00
$55.00
|
$55.00
Free
|
|
15 |
Testing for de-energised & energised testing
(free for members only- please log in)
|
$75.00
$55.00
|
$55.00
Free
|
|
16 |
Electric storage and safe use of batteries |
$75.00
$55.00
|
$55.00
$45.00
|
|
17 |
ASP Site assessment and set-up |
$75.00
$55.00
|
$55.00
$45.00
|
|
18 |
ASP Prove de-energised (dead) |
$75.00
$55.00
|
$55.00
$45.00
|
|
19 |
ASP Remove service fuse carriers |
$75.00
$55.00
|
$55.00
$45.00
|
|
20 |
ASP Reinstate service fuse and energise installation |
$75.00
$55.00
|
$55.00
$45.00
|
|
21 |
ASP Replacement of service fusebase/s |
$75.00
$55.00
|
$55.00
$45.00
|
|
22 |
ASP Disconnect of consumer mains at POA |
$75.00
$55.00
|
$55.00
$45.00
|
|
23 |
ASP Reconnection of consumers mains at POA |
$75.00
$55.00
|
$55.00
$45.00
|
|
24 |
ASP Installation of underground service mains |
$75.00
$55.00
|
$55.00
$45.00
|
|
25 |
ASP Connection of underground service mains |
$75.00
$55.00
|
$55.00
$45.00
|
|
26 |
ASP Disconnection of underground service mains |
$75.00
$55.00
|
$55.00
$45.00
|
|
27 |
ASP Installation of overhead service mains |
$75.00
$55.00
|
$55.00
$45.00
|
|
28 |
ASP Installation of metering equipment |
$75.00
$55.00
|
$55.00
$45.00
|
|
29 |
ASP Removal of metering equipment |
$75.00
$55.00
|
$55.00
$45.00
|
|
30 |
ASP Removal of metering equipment on asbestos backboards |
$75.00
$55.00
|
$55.00
$45.00
|
|
A SWMS (Safe Work Method Statements) is required for the 18 high risk construction work activities defined in the WHS Regulations.
A SWMS is a written document that sets out the high risk construction work activities to be carried out at a workplace, the hazards and risks arising from these activities and the measures to be put in place to control the risks. Its primary purpose is to help supervisors and workers implement and monitor the control measures established at the workplace to ensure high risk construction work is carried out safely.
The documents in this pack are not aimed to meet all of your legislative requirements, but assist you in establishing an initial Safe Work Method Statement framework that can be built upon over time.
All documents are in MS Word format so you can make revisions as you go forward. We would be pleased to assist and would certainly welcome any comments and suggestions.
In your purchase of NECA Generic SWMS, we wish to draw your attention to your responsibilities as a person conducting a business undertaking (PCBU), you are responsible for reviewing and implementing the NECA Generic SWMS into your own safety management system. As the PCBU, you must ensure that a safe work method statement (SWMS) are suitable or amended prepared prior to commencing any high-risk construction work, and that the work is done in accordance with the SWMS, which must be kept for the duration of the work.
Other responsibilities include:
- A PCBU must also ensure that workers have received induction and consultation of the Generic SWMS before undertaking any construction work, and a site induction before commencing work on a specific site.
- A PCBU must ensure that Generic SWMS are to be reviewed, and revised if necessary if the high-risk construction work changes or if there is any reason to believe that risk control measures are not adequate.
- NECA Does not guarantee that supplied Generic SWMS will pass all principal contractor or builders SWMS review process. Amendments may need to be made to suit principal contractor or builder requirements. * Amendments can be made by NECA for the cost of $120 (Exc GST) per hour.
- The National Electrical and Communications Association, its employees, officers and agents do not accept any liability for the results of any action taken in reliance upon, based on or in connection with NECA Generic SWMS. To the extent legally possible, the National Electrical and Communications Association, its employees, officers and agents disclaim all liability arising by any breach of any duty in tort (including negligent misstatement) or as a result of any errors or omissions contained in these document.